REHABILITATION
Waste Dump Rehab
Buru Rehab Director Ray Gerrard was instrumental in developing innovative techniques for waste dump rehab during the 1990’s. With his agricultural background, Ray developed the first dozer mounted seeding unit and was instrumental in developing the idea of concave slopes for waste dump rehab.
We partner with our clients to understand their sites and help determine the most appropriate strategy for long term effective rehab. This includes understanding of soil, waste rock characteristics, , geochemistry, material stability, design and constructability.